HomeAbout usContact InformationPicturesPower FlushingTestimonialsWorcester Bosch
threevans.JPG

Power Flushing Terms

Powerflushing a system prior to any work being carried out on a central heating system is now a requirement set out by any boiler manufacturer, this is a process where water and chemicals are pumped through your pipework at a very high velocity and this will have the effect of removing any flux residue and also the iron oxide (Black Sludge) that is prevalent in every central heating system. This process will help to eliminate any radiator cold spots and will also dispose of any residue that could potentially damage your new boiler and invalidate the guarantee. This process alone will not rectify faults that occur through having a badly designed system (Pumping over etc). If you have an open vented system with a header tank in the loft then this process has the potential to show up any weak points in your system and could result in leaks occurring from old pipes and/or radiators that are either rusted or badly fitted. * Please note  the Powerflushing process has not caused this damage but it has simply accelerated any problems and leaks that may occur in the future, and this could be while you are absent from the house possibly on a holiday. It is in our experience that if this is to happen it is better that a qualified heating engineer is present to rectify these problems if/when they occur.

All manufacturers insist that a system is flushed before a new boiler is installed and failing to do so could render their warranty period void.

Acceptance of a Power Flushing Quote from AMR Plumbing & Heating Ltd is also deemed as acceptance of these terms and conditions.  


GasSafeRegisterLogo.jpg

Energyeff.JPG

worcester_boiler.gif

megaflo.jpg

5yearwarr.jpg
Free 5 year warranty on all Worcester Bosch boilers *




Office : 01372 378 387